Hi,
I am on with laying the chipboard sub floor for the UFH. The house front to back is approximately 16m which is broken by a blockwork wall approximately 8m from the back of the house. Is it ok to run the chipboard all the way through at the 1 door threshold (Giving a total run of 16m) or should I break it on a joist at the door?
The chipboard is being glued and screwed if that makes any difference.
I am on with laying the chipboard sub floor for the UFH. The house front to back is approximately 16m which is broken by a blockwork wall approximately 8m from the back of the house. Is it ok to run the chipboard all the way through at the 1 door threshold (Giving a total run of 16m) or should I break it on a joist at the door?
The chipboard is being glued and screwed if that makes any difference.