I've just had a conservatory built and the builder has left a rough screed floor. I know that I've got to use a self levelling screed but am confused about one or 2 things:
a. Does the DPM go under or over the screed?
b. Should I anchor the first row of laminate strips to the felt underboard or does the entire floor float on the underlay?
Grateful for any advice!