Hi,
An opening (doorway) needs to cut through to access the main part of my loft. My architect has recommended leaving 250mm of brick beyond the purlin to maintain support.
I was wondering if this sounds correct?
Thanks
An opening (doorway) needs to cut through to access the main part of my loft. My architect has recommended leaving 250mm of brick beyond the purlin to maintain support.
I was wondering if this sounds correct?
Thanks
Last edited:
