Hi
Got a couple of gullies where the 110mm orange pipe goes through the cavity brickwork below dpc, which I have lintelled over. The building inspector has pointed me to the regs saying it must be surrounded by "Compressible sealant" and masked either side with a rigid board. Neither of which anything springs to mind, if anyone's got any suggestions they'd be gratefully received!
Cheers
John
Got a couple of gullies where the 110mm orange pipe goes through the cavity brickwork below dpc, which I have lintelled over. The building inspector has pointed me to the regs saying it must be surrounded by "Compressible sealant" and masked either side with a rigid board. Neither of which anything springs to mind, if anyone's got any suggestions they'd be gratefully received!