The driveway outside our house is crazy paved and too high so bridges the dpc resulting in a damp room.
I can't afford to get the whole lot replaced so my plan was to rent an angle grinder and cut a channel about 6 inches from the wall, break up the paving and then fill with gravel.
Does this sound sensible? Do I need to line the channel with anything or paint the brickwork? I have an SDS chisel drill, would this be any good for breaking up the paving once the cut has been made or will I need something more heavy duty?