First floor screed for UFH

Joined
11 Mar 2009
Messages
9
Reaction score
0
Location
London
Country
United Kingdom
Hi, I'm installing wet under floor heating to a first floor bathroom but have a problem with floor levels. The top of the joists are 100mm below the adjacent floor levels - ie the bathroom floor joists are 100mm below the level of the hallway.
My first thought is to screw ply (22mm?) onto the joists then lay the UFH pipes and screed (75mm) onto this.
What do you guys think?
 
Sponsored Links
Thanks for your suggestion thereisaplan.
I definitely need to make up 100mm to get to my adjacent floor levels though. Other suggestions or comments on my proposed solution gratefully received!
 

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Sponsored Links
Back
Top