I have just had a conservatory built and the builder has said it would be cheaper as i am tiling it to use thick bed adhesive .I bought 4 bags at £25 each and two bags have not even build up a third of the area.It is 3.2mX2.2m and i need to build up the area 25mm before i start to tile .Would it be better to build up the 25mm with levelling compound or is this too much ?.Also is it easy to use as i have not levelled a floor before.
Thanks in advance