- Joined
- 22 Jul 2016
- Messages
- 5,875
- Reaction score
- 1,081
- Country
I have a room that is presently about 40 foot square and has four concrete pillars in the centre, dividing the room in a sort of # shape
We need to cover the floor with hardboard, which will stay down a while, over industrial carpet.
The idea is to use gaffertape underneath the but joins, and tape over the joins at the top.
It will be painted with floor paint eventually
I have tiled before, so know about starting in the middle and spreading out to get any cuts around the perimeter - we would stagger the boards in a brick style pattern
Sound sensible?
Any ideas?
We need to cover the floor with hardboard, which will stay down a while, over industrial carpet.
The idea is to use gaffertape underneath the but joins, and tape over the joins at the top.
It will be painted with floor paint eventually
I have tiled before, so know about starting in the middle and spreading out to get any cuts around the perimeter - we would stagger the boards in a brick style pattern
Sound sensible?
Any ideas?