Hiya guys
Still trying to get my head around this whole quoting thing, everytime I do it, I get different answers lol,, so can I post it here and see if someone can help
Job is 7 meteres up 5 Meters across = 35 m2
Felt Needed - 1.5m x 50m roll = 25m2 needed?
Slates are 14x8 welsh (14-3 = 11) /2 = 5.5 Gauge
Slates needed + 10% 1848 @ .80p each = 1478.40
Labour - 1 Tradesman @ £8.50 and 1 Labourer @ 5.00 = 13.50 p/h
Here goes lol
Take delivery and unload / stack slates - 30mins @ £ 6.75 (13.50 / 2)
Breathable Felt 50m x 1.5 - £99.99
Needed 25m2 (99.99 / £3.99)
Cost of felt per m2 - £3.99?
Slate - 1848 / 35m2 - 52.8 - rounded to 53 slates per m2?
Trade & Labourer lays 3m2 per hour = 159 per slates per hour
Trade & Labourer cost per m2 - £4.49 (35m2 / 3m2 per hour * £13.50)
Total cost per m2 is £50.88?
or am I way off line lol
Still trying to get my head around this whole quoting thing, everytime I do it, I get different answers lol,, so can I post it here and see if someone can help
Job is 7 meteres up 5 Meters across = 35 m2
Felt Needed - 1.5m x 50m roll = 25m2 needed?
Slates are 14x8 welsh (14-3 = 11) /2 = 5.5 Gauge
Slates needed + 10% 1848 @ .80p each = 1478.40
Labour - 1 Tradesman @ £8.50 and 1 Labourer @ 5.00 = 13.50 p/h
Here goes lol
Take delivery and unload / stack slates - 30mins @ £ 6.75 (13.50 / 2)
Breathable Felt 50m x 1.5 - £99.99
Needed 25m2 (99.99 / £3.99)
Cost of felt per m2 - £3.99?
Slate - 1848 / 35m2 - 52.8 - rounded to 53 slates per m2?
Trade & Labourer lays 3m2 per hour = 159 per slates per hour
Trade & Labourer cost per m2 - £4.49 (35m2 / 3m2 per hour * £13.50)
Total cost per m2 is £50.88?
or am I way off line lol