Hi

We have just had underfloor heating put in a room that is 6m by 6m. The screed went down on Friday and the builder has advised us to not use the heating for at least 6 weeks. We plan to put a wood floor over the top.

6 weeks sounds like a long time to let the screed dry fully. Is this standard practice as most online stuff says 7 to 21 days depending on what the screed is composed of?

Thanks.
 
Sponsored Links
Ask your screed supplier, but 4-6 weeks isn't unusual. You should ensure it's dry before you lay the wooden floor as well, or you'll end up with your wood absorbing the moisture, which will lead to sadness
 

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Sponsored Links
Back
Top