Hi
We have just had underfloor heating put in a room that is 6m by 6m. The screed went down on Friday and the builder has advised us to not use the heating for at least 6 weeks. We plan to put a wood floor over the top.
6 weeks sounds like a long time to let the screed dry fully. Is this standard practice as most online stuff says 7 to 21 days depending on what the screed is composed of?
Thanks.