How long does it typically take to convert a conventional boiler to a combi central heating system?
The property has a conventional boiler, tank with immersion heater and two tanks in the loft. I would want:
* All tanks removed
* Boiler replaced with a combi boiler
* Possibly new rads (say, 7 in total)
* Possibly a Powerflush