Just a quickie for you - if theres one immersion heater circuit supplying 2 seperate immersion heaters (in one tank) both are 3kW each, surely this needs to be turned into 2 seperate circuits one for each, as if both immersions were on at the same time they will pop out the 16A MCB.
Also how would you connect up a immersion heater time clock (economy 7 type from Newlec) which has a boost function. Currently the off peak supply controls the lower immersion heater, but the boost function wants to switch on the higher element.
Ah, just a thought, is 1 circuit for both ok, if the time clock doesnt allow both elements (ie off peak elemnt and boost element) to be on at the same time?? Thanks all...
Also how would you connect up a immersion heater time clock (economy 7 type from Newlec) which has a boost function. Currently the off peak supply controls the lower immersion heater, but the boost function wants to switch on the higher element.
Ah, just a thought, is 1 circuit for both ok, if the time clock doesnt allow both elements (ie off peak elemnt and boost element) to be on at the same time?? Thanks all...