When putting down hardcore (type 1) as part of foundation. Should you layer it and go over each layer with a wacker plate and if so why?
Builder has just laid all 3 tons even though building inspector said layer it. If it doesn't make any difference I'm happy to leave it but if it does then I need to say something.
I'm not sure if he'll wackier the top or lay the sand on top then wackier it.
Builder has just laid all 3 tons even though building inspector said layer it. If it doesn't make any difference I'm happy to leave it but if it does then I need to say something.
I'm not sure if he'll wackier the top or lay the sand on top then wackier it.