I’ve just lifted some very old ~2.5inch thick slabs that have had a shed on them but laid on bare soil and I want to put a bigger shed on there so I figured I need to lift and level them with a more sturdy sub base.Is the right plan of action here to drive some pegs into the ground to make sure I’m level and fill with MOT type 1 and compact it? And if it is, what kind of amount would I need?
It’s only to hold an 8x10 metal shed for a couple of years so I’m not sure what would be bodging and what would be overdoing it.
thanks