I have a small area side of the house im looking at putting gravel down and also a small pathway leading up to the shed with gravel surrounding the path.
My plan is to dig everything up and level off as best i can. Drive some pegs in and fill with 50mm or so of Type 1 MOT. Compact and make sure all is level before laying a weed membrane . Should this be done before the Type 1.
Then lay the slabs /paving i want with a mortar mix. Then to finish off, infill with pea shingle to the slab level.
Does this sound about right? Is it ok to mortar straight onto the Type 1 MOT.
My plan is to dig everything up and level off as best i can. Drive some pegs in and fill with 50mm or so of Type 1 MOT. Compact and make sure all is level before laying a weed membrane . Should this be done before the Type 1.
Then lay the slabs /paving i want with a mortar mix. Then to finish off, infill with pea shingle to the slab level.
Does this sound about right? Is it ok to mortar straight onto the Type 1 MOT.