G
Goldspoon
What sort of time would you plumbers out there allow for the following (about):
Remove rad in kitchen and replace with towel rad... similar position, 10mm copper, pipes run just above skirting board and no need to hide or box in.
Obviously job includes time for draining down, refilling and adding inhibitor.
Remove rad in kitchen and replace with towel rad... similar position, 10mm copper, pipes run just above skirting board and no need to hide or box in.
Obviously job includes time for draining down, refilling and adding inhibitor.