Hi, I am due to get my hose render in the next month and I have badly installed stoe clading that was put on using lime mortar.
The bottom have of the house is cladding and the top is going to be tc15 on xpx base coat.
The stone clading will be separated from the render by a bead and a slate drip sill.
Using a chisel on a drill to take the cladding off will the vibrations damage the render?
I can not delay the rendering as need the house singed off by building control and I will do thus work after that has happened.
Thanks