Hi everyone
I've core drilled the hole for my toilet waste, misjudged the angle and it's too steep. It falls just under 50mm over 300mm through the wall. Over this distance am I going to have problems with solids being left behind and causing a blockage?
The pan is immediately inside this hole and the run straight out the wall, into a 90 deg elbow and then 70mm straight run into the soil stack.
Do I need to reduce the gradient or will this be OK?
Any thoughts gratefully appreciated