Top render fell off wall after 24 hours of applying scratch coat. Should it have been 48 hours?

Joined
18 May 2012
Messages
93
Reaction score
2
Location
Cheshire
Country
United Kingdom
I hired a guy recommended by my window cleaner to render 2 upper outside walls in cement/sand whilst we were away. Received a message that the top coat had slippe off after being applied morning after scratch coat applied morning before. Both wall s are soft Cheshire clay commons. Render has done a runner leaving site it a terrible mess. On removing his scratch coat (6/1 plastering sand) found it well attached suggesting bonder/primer applied. However when removing the scratch coat found it easily crumbled like chalk when lightly tapped. It's surface was almost plain faced with poor combing in only a few areas which part explained why 6/1 top coat slipped off. Any clues on why the scratch coat should only have the strength of a digestive biscuit? Was it just the 24 hour diff between coats or were there other causes?
 

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top