Hi guys,
I'm in the process of laying a new concrete floor. We have the concrete slab in along with the insulation, dpm, etc. The slab was laid on Sunday so it has been drying for about 2 days.
I plan to lay a 50mm layer of screed on top. My question is, how long should I leave the slab to dry before screeding?
Many thanks.
Alex