Hi , after 10 years our bathroom is in need of a refurb...So i have a couple of questions....Are the plastic panels that go in before a shower cubicle any good..? The reason i ask is that after about 8 years the tile grout cracked allowing water through to the plasterboard...( should have been aquapanel i know )So my plan this time is to rip out all old stuff and install aquapanel instead of plasterboard behind the shower..But is it necessary if i line the shower with those acrylic sheets, or can i stick with plasterboard ? .I intend to tile the bathroom half way up this time..So does the shower cubicle and associated panels go in first , then tile up to them?...For the past 10 years i have had a Mira 415 thermostatic valve fitted,,and it has been faultless...But it's gold and the wife wants Chrome this time , so what in peoples opinion should i be replacing it with? My combi is an ageing ( but still works perfectly ) Vaillant 242 E..All suggestions greatly appreciated....Bill
