Hi, can anyone help difuse a potential problem with our contracter/plumber?
As basically as possible we are renovating a fairly good sized house. The builders ripped out an existing 28mm gas main that ran 8 metrs through the property.
It supplied a 100btu CHB and tee'd off to feed a 5kw gas fire and an unknown load for a kitchen gas hob.
So, the plumber has relaid a 22mm main that now has to supply a 35/38kw boiler and the 5kw gas fire. The gas feed to the hob is no longer required, but there will be a take off a metre or so along the run for a 2nd gas fire.
Hope thats clear. Is the 22mm pipe good enough for this load????
Need to acy quickly before the whole lot gets boxed and plastered,
Cheers.
As basically as possible we are renovating a fairly good sized house. The builders ripped out an existing 28mm gas main that ran 8 metrs through the property.
It supplied a 100btu CHB and tee'd off to feed a 5kw gas fire and an unknown load for a kitchen gas hob.
So, the plumber has relaid a 22mm main that now has to supply a 35/38kw boiler and the 5kw gas fire. The gas feed to the hob is no longer required, but there will be a take off a metre or so along the run for a 2nd gas fire.
Hope thats clear. Is the 22mm pipe good enough for this load????
Need to acy quickly before the whole lot gets boxed and plastered,
Cheers.