A customer of mine recently fell out with her builder. She commissioned someone to create a 233 page snag list.
I have scanned some of it.
A lot of the report seems to make sense but there are a couple of bits that surprised me.
The property was a first floor maisonette, An additional floor was added so that it could become two separate flats (1st and 2nd floor).
Each floor has its own combi-boiler. Both have boilers in storage space with twin, floor to ceiling MDF doors.
The report says that they should have fire rated doors rather than MDF.
I have worked in numerous properties when the combi is in a cupboard in the kitchen.
Is the report correct?
I have scanned some of it.
A lot of the report seems to make sense but there are a couple of bits that surprised me.
The property was a first floor maisonette, An additional floor was added so that it could become two separate flats (1st and 2nd floor).
Each floor has its own combi-boiler. Both have boilers in storage space with twin, floor to ceiling MDF doors.
The report says that they should have fire rated doors rather than MDF.
I have worked in numerous properties when the combi is in a cupboard in the kitchen.
Is the report correct?