Ive just had a fairly large extension to the house which reconfigured my existing layout at the same time. Bar a few outstanding snags this is all but complete now. Question is what paperwork do I need from the electrician and heating engineer/plumber. The electrical work was fairly extensive although the plumbers job was more straightforward, installing anew Gas Fire and installing new range cooker (aside from the tinkering with rads etc). I spoke to the builder and he said that they need to send off for the paperwork - is this right? Surely I should get something before they set off into the sunset?
Any guidance/advice greatly appreciated.
Many thanks