I’ve a slow dial up connection and ie keeps crashing !! when clicking on search results so please don’t flame me when I ask these question that may have been answered before.
I have an elderly conventional C/H system with a F&E tank in the loft. I’m doing some renovation and would like to get rid of the tank and go to a sealed system.
1) Can I simply take out the tank and pipe in the pressure vessel onto the feed line. ?
2) Does it matter that the pressure vessel is at the furthest run from the boiler?
3) Until I lift the floor boards I can’t be sure if the original feed is on the flow or the return line, does it matter for the pressure vessel.
4) The prv will have a pipe run of 15 feet before it exits through a wall, Its not ideal but is it acceptable?
TIA
I have an elderly conventional C/H system with a F&E tank in the loft. I’m doing some renovation and would like to get rid of the tank and go to a sealed system.
1) Can I simply take out the tank and pipe in the pressure vessel onto the feed line. ?
2) Does it matter that the pressure vessel is at the furthest run from the boiler?
3) Until I lift the floor boards I can’t be sure if the original feed is on the flow or the return line, does it matter for the pressure vessel.
4) The prv will have a pipe run of 15 feet before it exits through a wall, Its not ideal but is it acceptable?
TIA