Hi all
I am moving back into my parents old house in the coming months. I am after, as usual, some advice on the work i need to get done in ascending order.
The house is a 1950's prefab and is quite dated and needs updating, so what i wish to do is as follows, but not sure in what order,
full rewire
kitchen refurb
entrance porch extension with a bedroom extension above
removal of old boiler and combi installed
removal of downstairs toilet, space left to be used in conjunction with the kitchen
All advice will be greatly appreciated.
Many thanks
I am moving back into my parents old house in the coming months. I am after, as usual, some advice on the work i need to get done in ascending order.
The house is a 1950's prefab and is quite dated and needs updating, so what i wish to do is as follows, but not sure in what order,
full rewire
kitchen refurb
entrance porch extension with a bedroom extension above
removal of old boiler and combi installed
removal of downstairs toilet, space left to be used in conjunction with the kitchen
All advice will be greatly appreciated.