Ripping out some wiring today in preperation of an office refit. The offices are part of a large factory which had a few maintenance sparks until the site was sold and taken over.
I guess one of the maintenance staff added an FCU for a heater........
Double socket at dado height, 10mm hole drilled through the noggin in the stud wall, and singles dropped inside stud to the new dry lining box......
I guess one of the maintenance staff added an FCU for a heater........
Double socket at dado height, 10mm hole drilled through the noggin in the stud wall, and singles dropped inside stud to the new dry lining box......
