I've posted previously about this, but didn't really get any definitive answers.
Basically after ripping out the old kitchen I found this hole beneath. Having cleared out nearly a buckets worth of rubbish I'm left with the following.
There is about 100mm of concrete, then the dpm which you can see has been broken, then about 65mm of screed on top of that. Below the initial concrete is a void of at least 10cm and it goes both left and right. The soil pipe feels solid, although the top of the plastic pipe sits below the top level of the screed.
Presumably the gap under the concrete is normal, and somewhere there will be footings?
My problem is, how do I make this water/damp/draught/rodent proof? I need to get a plumber to either lift, or extend the mdpe pipe so the stop cock is accesible, but I'm wary of cementing it in. I was thinking of perhaps lagging it in something (not sure what) then cementing up to the dpm level. Then attaching new dpm. But then what? Should I cement further? Like I say, I can't bring it to floor level without cementing in the removable waste pipe attachment that goes to the sink.
Sorry for the long post but this is really troubling me.
View media item 76857
View media item 76854
View media item 76855
View media item 76856
Basically after ripping out the old kitchen I found this hole beneath. Having cleared out nearly a buckets worth of rubbish I'm left with the following.
There is about 100mm of concrete, then the dpm which you can see has been broken, then about 65mm of screed on top of that. Below the initial concrete is a void of at least 10cm and it goes both left and right. The soil pipe feels solid, although the top of the plastic pipe sits below the top level of the screed.
Presumably the gap under the concrete is normal, and somewhere there will be footings?
My problem is, how do I make this water/damp/draught/rodent proof? I need to get a plumber to either lift, or extend the mdpe pipe so the stop cock is accesible, but I'm wary of cementing it in. I was thinking of perhaps lagging it in something (not sure what) then cementing up to the dpm level. Then attaching new dpm. But then what? Should I cement further? Like I say, I can't bring it to floor level without cementing in the removable waste pipe attachment that goes to the sink.
Sorry for the long post but this is really troubling me.
View media item 76857
View media item 76854
View media item 76855
View media item 76856