Hi
Just completed a house move to market harb going from a house with a combi to a larger place (bathroom with shower, 1 ensuite with electric shower, 1 separate shower toilet) 15 rads. I asked 1 company 2 tradesman, only the company have come to quote so nothing to compare it too. Guess the tradesmen have a lot of work on
We've been quoted 4285 materials 1360 labour total £6774 (inc vat) to replace the cylinder / loft tank / Mexico floor standing boiler with an unvented system. I asked to factor in future increase in bathrooms if we extend.
Does the price seem reasonable for the below?
To disconnect and clear away existing boiler, cylinder and tanks in loft,
Supply and install Worcester Bosch Greenstar 35Kw 8000 Series Condensing System boiler in store room as discussed,
Supply and install new horizontal flue system through wall,
Supply and fit Hive internet room thermostat,
Run existing gas supply and connect to boiler, Run hot and cold pipework to store room and connect,
Run heating pipework to store room and connect under boiler,
Supply and install Qty 2 x Honeywell zone valves to independently control hot water and central heating system,
Supply and fit by pass valve to system,
Supply and install Joule 300 Ltr indirect mains pressured unvented hot water cylinder fitted with immersion heater and all relevant safety valves in store room,
Re connect hot and cold pipework in airing cupboard,
Supply and fit Worcester Bosch magnetic filter,
Carry out a Magnacleanse system flush for added boiler protection,
Run condensate pipe into soakaway as discussed,
Insulate all pipework in store room,
Brick up and make good existing boiler flue hole,
Carry out electrical work to boiler, cylinder and controls
Re fill system with inhibitor,
Fully Commission and test.
Just completed a house move to market harb going from a house with a combi to a larger place (bathroom with shower, 1 ensuite with electric shower, 1 separate shower toilet) 15 rads. I asked 1 company 2 tradesman, only the company have come to quote so nothing to compare it too. Guess the tradesmen have a lot of work on
We've been quoted 4285 materials 1360 labour total £6774 (inc vat) to replace the cylinder / loft tank / Mexico floor standing boiler with an unvented system. I asked to factor in future increase in bathrooms if we extend.
Does the price seem reasonable for the below?
To disconnect and clear away existing boiler, cylinder and tanks in loft,
Supply and install Worcester Bosch Greenstar 35Kw 8000 Series Condensing System boiler in store room as discussed,
Supply and install new horizontal flue system through wall,
Supply and fit Hive internet room thermostat,
Run existing gas supply and connect to boiler, Run hot and cold pipework to store room and connect,
Run heating pipework to store room and connect under boiler,
Supply and install Qty 2 x Honeywell zone valves to independently control hot water and central heating system,
Supply and fit by pass valve to system,
Supply and install Joule 300 Ltr indirect mains pressured unvented hot water cylinder fitted with immersion heater and all relevant safety valves in store room,
Re connect hot and cold pipework in airing cupboard,
Supply and fit Worcester Bosch magnetic filter,
Carry out a Magnacleanse system flush for added boiler protection,
Run condensate pipe into soakaway as discussed,
Insulate all pipework in store room,
Brick up and make good existing boiler flue hole,
Carry out electrical work to boiler, cylinder and controls
Re fill system with inhibitor,
Fully Commission and test.