Hi everyone
I am going to prepare and lay the concrete floor to my extension myself.
I will need to run a pipe under the floor to provide ventilation to the existing suspended floor.
I have already laid down hardcore and sand.
I wanted to do the concrete slab first and then the insulation, followed by screed.
Before i pour the concrete slab, do i need to put down a membrane first)
I am going to prepare and lay the concrete floor to my extension myself.
I will need to run a pipe under the floor to provide ventilation to the existing suspended floor.
I have already laid down hardcore and sand.
I wanted to do the concrete slab first and then the insulation, followed by screed.
Before i pour the concrete slab, do i need to put down a membrane first)