I believe my elderly father has been ripped off by a cowboy roofer and I wanted to get the opinion of others as to what extent.
He has a gable end 3-bed detached house.
He paid £13,000 for this:
- All roof felt and batons replaced, existing roof tiles reused (no new tiles)
- New dry ridge fittings
- Bird guards added (to stop birds getting in under the first roof tile)
- All scaffolding costs included
- All removal of all waste included
The scaffolding was put up in advance but the actual work on the roof was all done in 1 day by a team of 5 or 6 guys. They arrived at 8am and had finished at 4pm latest as it would have been dark by then.
Given the information above does anyone have a ballpark figure of what a reasonable quote would be?
(The guy didn't provide a quote or invoice and I haven't contacted him to ask for a breakdown of costs... yet)
Thanks in advance
He has a gable end 3-bed detached house.
He paid £13,000 for this:
- All roof felt and batons replaced, existing roof tiles reused (no new tiles)
- New dry ridge fittings
- Bird guards added (to stop birds getting in under the first roof tile)
- All scaffolding costs included
- All removal of all waste included
The scaffolding was put up in advance but the actual work on the roof was all done in 1 day by a team of 5 or 6 guys. They arrived at 8am and had finished at 4pm latest as it would have been dark by then.
Given the information above does anyone have a ballpark figure of what a reasonable quote would be?
(The guy didn't provide a quote or invoice and I haven't contacted him to ask for a breakdown of costs... yet)
Thanks in advance