We have been carrying out an extensive renovation (with all the central heating having been removed). With the cold winter months, some surface damp has formed on walls.
The central heating is not due to go back in for a 6-8 weeks+
The plasterer thinks it doesn’t cause an issue for plastering, this is correct? I was think we should warm the house up to avoid any issues with locking in moisture in walls etc.
Welcome thoughts and advice on which way to go. (not sure if the plasterer is just wanting the job and therefore telling me it's fine to go ahead now).