Yeah just dishwater, hosepipe and kitchen cold off the mains. The rest of the house goes through the balanced cold.
Just to recap.
Original install: Only one (ICG) PRV, cold taken off the balanced ICG port, but EV take off from a T downstream of the ICG and not from the port on the ICG.
Don't know if the system worked OK for 6 months or so? before water hammer, but a PRV was/is installed upstream of the ICG.
Piping mods, in no particulr order.
Remove the upstream PRV and install a T piece with the take off blanked and reposition the EV take off to the ICG port, but this probably requires a G3 to do so?, so maybe last option, the present EV take off should be fine as its downstream of the ICG check vave, Caleffi have also confirmed this, but who knows, this change should probably be the last throw of the dice.
As above but reposition the PRV on the T, remove the cold from its balanced port, blank the balanced port and installl the cold take off from this PRV.
If no cure, as above, but then reposition the EV pipe to its ICG port, the system is then exactly as designed.
Present ICG piping, (EV take off from downstream T), the "PRV" should have been labeled "ERV" waste pipe, its the drain pipe to the tundish from the 6bar ERV (expansion relief valve).