Was looking at priming the floor with sbr bond and installing a shower tray on new floor boards in a bathroom. Was looking at a weak mix of sand and cement. My question is this will have a day 15- 20mm bed? If the floor is then getting lino fitted this wouldn't cover to a height that woul stop the sand and cement bed still being visible.
