Distance from CU to Shed is 6M. nothing big plugged in there ( no welders for instance, just normal hand power tools like drills, jigsaw etc.
Cable will go underneath the floor of the Kitchen/Bathroom extension of a two-up two-down terraced house and through the wall directly to the adjoining Brick-Built shed ( using the end-wall of the extension for one side of the shed ) and terminate on a 6-way CU with an RCD fitted.
Would the house earth carried from the CU in the cpc be OK for this or would I have to provide a new one situated in the shed ?
As far as I know I have a TNC supply if that needs to be taken into account.
This cable is going to replace a totally unsuitable feed that I found which consists of 4mm single cables taped together. It was noticed by RF Lighting in my original thread HERE
Thanks as usual guys.
Cable will go underneath the floor of the Kitchen/Bathroom extension of a two-up two-down terraced house and through the wall directly to the adjoining Brick-Built shed ( using the end-wall of the extension for one side of the shed ) and terminate on a 6-way CU with an RCD fitted.
Would the house earth carried from the CU in the cpc be OK for this or would I have to provide a new one situated in the shed ?
As far as I know I have a TNC supply if that needs to be taken into account.
This cable is going to replace a totally unsuitable feed that I found which consists of 4mm single cables taped together. It was noticed by RF Lighting in my original thread HERE
Thanks as usual guys.