Hi, I'm about to lay a screed floor onto the concrete base in my kitchen extension, and this will cover a 22mm gas pipe which feeds the boiler.
I've heard that the cement will corrode the copper pipe, which sounds like it should be avoided, so any tips on what to put on or around the pipe to...
I'm building a lean to roof using Marley Wessex tiles but I can't figure out how to make lead flashing fit the shape of the roof. Do I just stretch the lead by bashing it down into the 'valley' part of tile, or is there a more technical answer? Different type of flashing?
Thanks in anticipation.
I'm building a kitchen extension and the drawing has: '4mm WBP plywood tilting fillet at eaves'.
I'm pretty ignorant about building terms. Can anyone tell me what this is and what its purpose is.
Thanks,
Arf.