Recent content by Cal10

  1. C

    Glowworm Migo ebus connection.

    No problem, hive or nest might be the better option if you are wanting the internet control as that just replaces the programmer and thermostat. The hive receiver even uses the same backplate as your current programmer so should be a straightforward swap.
  2. C

    Glowworm Migo ebus connection.

    Unfortunately if it’s a MiGo you want it’s not as simple as connecting it to the boiler you have - you’d need the MiGo system pack. This includes a new wiring centre which you’d have to connect your zone valve(s), cylinder thermostat and MiGo to which is then connected to the ebus connection on...
  3. C

    Vaillant ecotec 418 F72 F83 faults

    I’m pretty sure it’ll be bypass/pump overrun related so it’s not going to help.
  4. C

    Vaillant ecotec 418 F72 F83 faults

    Where is the pump wired to? It should be the wired back to the PCB on the boiler. I’d also change the pump setting to II to make sure it is definitely opening the bypass after demand ends. Get them to double check the 24v link has been removed too.
  5. C

    Vaillant Ambisense R920 unit/Ecotec Plus 831 installation problem

    No worries - it’s really not very clear.
  6. C

    Vaillant Ambisense R920 unit/Ecotec Plus 831 installation problem

    Yeah the Ambisense controls are meant to be used on conjunction with either a VRC700 or a sensocomfort hence the ‘no compatible control’ error.
  7. C

    Vaillant Ambisense R920 unit/Ecotec Plus 831 installation problem

    That’ll be why it’s not working. You’ll need a VRC700 as well.
  8. C

    Vaillant Ambisense R920 unit/Ecotec Plus 831 installation problem

    Have you also got a VRC700 controller plugged in somewhere?
  9. C

    Correct order for felting flat roof

    That’s really helpful, thanks very much.
  10. C

    Correct order for felting flat roof

    Hello, I’ve built a garage in my garden and I am planning on getting a roofer in to felt the roof. I’ve got the joists on and they are coververed with 18mm OSB3 boards. Was wanting to add 18mm UPVC fascias all round and guttering on one side. Can somebody tell me the order I need to do this...
  11. C

    Hive Heating 2 wiring

    You need to put a link in from live to terminal one on the single channel hive receiver. The live and neutral just power the receiver. You need power at terminal one as when it is turned on the receiver switches power from terminal one to three.
  12. C

    Advice on fitting a boss to waste pipe

    Brilliant, I've had a look and it's Polypipe. I'll track down an adaptor and go in that way. Thanks for your help, glad I asked now!
  13. C

    Advice on fitting a boss to waste pipe

    That makes sense - never though of that. Does the same apply if I use the pre formed boss that's already in the side of the tee? Or is the whole fitting a no go zone? Thanks for your help.
  14. C

    Advice on fitting a boss to waste pipe

    Hi, I'm fitting an Ikea kitchen. The cabinets have not service gap at the back so I was hoping to move the 40mm waste pipe down as close to the floor as possible. I was looking to drill and fit a boss just below the small notch that sticks out the soil pipe. Is this possible? Just to...
Back