Just to update here, we changed the plans with the new fitter. Timber frame, ply and now we have access if needed in the future. We did use a pvc fascia to cover the gap which looks great. Routed the shower waste out of the wall similar to the original pic but now has its own dedicated pipe and...
Hi Ree. Interesting thoughts. Higher thresholds is a concern but if it is at the expense of a perfectly new leveled floor it is something that may need to happen. No hammer drill unfortunately. Skirting removed. Pipes shouldn't be an issue. No dampness but one small section has failed with old...
Will look into this thank you. Looks like a popular product. Im sure there is a method to ensure the 5mm as i woild like to keep the height minimal due to impact with adjacent rooms.
Thanks. Appears it will need to be levelled then. This was my initial thought. I am very tempted to try this myself but just concerned about getting the right height and do not have a mixing paddle machine. The room itself is about 4m x 2.5 m
Hi all. Can this kitchen floor be tiled over safely or is a self level required? Cannot really scrape more off. Had conflicting views from a few tradespeople who have viewed. Appreciate any views on this thank you.
We have that method upstairs but have left access just under the waste. It is directly underneath our front porch/entry which is very handy for any issues in the future. But we have paused this current job as a number of other issues cropped up such as double boarding and using push fits in...
Morning.. thank you. You're right and if I had known this I would have put a stop to it. This is at my mums property so I am not around to keep an eye on things and work full time. My fault for not clarifying all of the little details. But you shouldn't have to should you?! I can see other...
Pipes replaced but push fits used and buried in plaster which i have had to remove as I wasn't expecting push fits in this space. Will be tiled but I have never come across push fits buried hence I am seeking some advice on this. Im getting quite stressed about this now as this job needs...
Thank you. I am definitely a bothered type with these kinds of things! But if they are fine operationally then I guess that should be the overriding factor.
If we change plans and simply raise the tray, would it be better just using a riser kit or on to a bed of concrete or timber frame? Its a 1200 x 700 tray and we will also need to route the basin waste into the pipework as that is how it was previously with both water exiting through the one...
No from what he has explained, dig out a channel from inside the room and connect to the main soil pipe which is connected to the drain you can see in the pic. The drain actually runs back on itself underneath the room where it joins the toilet pipe and then onto the manhole. So basically a...