Hi
We have just finished an extension with a screed floor (which we laid loose cable UFH. This joins to what was the existing kitchen floor which I had to raise by 12mm (using ply) to keep both floors the same level and have no threshold/trasition to lay Karndean LVT throughout.
The big issue...
Hi
We are in the process of having kitchen fitted. We are using the existing supply (that was for dw & wm) which is on its own 4mm radial with a 32A MCB for new multi oven (3.7kw) with a 20A double pole isolator.
The plan is to have the combi oven (3.6kw) on its own supply however, for the...
Hi
Many thanks to all the comments, really all I was looking for is to run appropriate cables before I renovate the existing house as floorboards are available and loft has yet to be boarded?
The cable run from the CU would be around 15m
Hi
Just wanted to start planning and get an idea of materials and setting out?
I am looking to do most (if not all the) first fix and have spark connect and test.
The existing wiring is on a RCD (10 yr old CU) and looks to have been split into a radial circuit. The new extension internally...
Hi
Thanks again for the replies. Sorry I hand't mentioned there looks to be a Hager Relay for the HW pump & CH pump which is making it more confusing?!
Hi & many thanks for the reply.
I will try and explain the current setup (& hope it makes sense!)
There is a 3A fcu which has a dial timer connected (in room where boiler is located). In the hall there is an old thermostat with a dial (HWC in loft and is controlled seperately).
I would like...
Hi
Having just moved house (from having a gas combi boiler) to our new house (oil central heating/HW)
I would like to replace the old dial thermostat and mechanical timer with a new wireless unit. My understanding is I swap the dial thermostat with the receiving unit? If so would I then just...