Recent content by sham

  1. S

    2 gang 2 way switch

    Where the link is on the old switch, move them over to the new commons on the new switch. Then you move the L2 from the old switch to the new L1 switch. Then you move the L3 cables from the old switch to the L2 on the new switch. Make sure the circuit has been isolated prior to changing...
  2. Untitled

    Untitled

  3. S

    Periodic Inspection Report

    Hi Everyone I had a job to do a pir in Harrow on the hill this morning on a one bedroom ground floor flat, here are some pictures to show, would like some opinions on some factors regarding the installation. 1 - Sockets and spur was directly above electric hub, Owner suggested to put a...
  4. Bunched circuits

    Bunched circuits

  5. Consumer unit

    Consumer unit

  6. socket and spur directly above the electric hub.

    socket and spur directly above the electric hub.

  7. PIR 6-5-10

    PIR 6-5-10

    Pir
  8. S

    design work for dentist sergery

    Thank's big_sparks, I Found the legislation for lux figure's for dentistry, they are as : Operations: -general-----300 -mouth------8000/22000----Dental inspection luminaire required. Treatment: -general-------400/500 -mouth---------1000--------Examination luminaire required...
  9. S

    design work for dentist sergery

    Thank's big_sparks, can you give me some example say for the first room, which is the treatment room, area size 12.02 sq metres? cheers
  10. S

    design work for dentist sergery

    Thank's all Waiting for lighting software so i can measure lumen for area. Any sugestion how to get a copy from manufacture's as have tried but haven't recieved one, and any advice on lumen calculation?
  11. S

    design work for dentist sergery

    Thank's all, i have started the design work as you will notice i have got the area measurement from A1 plan, which is in scale 1cm to 50cm. however the next stage is a bit complex and require's manufacture data which i need to obtain soon as. Then next to calculate maximum demand. The...
  12. S

    design work for dentist sergery

    With christmas here am looking for all the help i can get on this subject due to time constraint's. thank's all
  13. S

    design work for dentist sergery

    Hello all Viewer's Im doing a project design for a two-storey dentist sergery, would appreciate help to select using manufacturer's data, select suitable luminaires for each area.( Using possibly data from Thorn Catalogue). all other suggestion appreciated. Ceiling's are as follow. All...
  14. S

    Centermetre's convert to Area squared

    Hi All............................................................................................. Just have started my project at college, need some fomula's to calculate area from centimetre's into square's, is it time's 50, then divide by 100 and anybody Know were i can get some...
  15. S

    Pyro Vs SWA

    can you point to me were you got these figures for the cable sizing for pyro, swa and xlpe as i was checking in the regs but couldn't find them. if they are in the regs please tell me the page no' on BS7671....
Back