I just want to check I'm getting all the layers down that I need. I don't want the toilet to flush uphill :)
I currently have the dreaded chip. 18mm.
I'm thinking I need to add:
Hardie + adhesive and screws.
Uncoupling membrane+ it's adhesive (or do I not need this with the hardibacker)
Then my...