I remember when I was called to a pumping station site which had lost all power, which turned out to be a DNO power failure. The DNO, UKPN, came out and supplied a generator for us. The site was fed from a UKPN 11KV fed into a UKPN substation (on our site) with a 11KV to 415V 800KVA transformer...