You'll be lucky if Stender is still watching this thread.
My own extension was piled. 5 piles were driven at 115kN and all refused between 8m and 8.5m, which gives you about 45kN/m. That was done with a small hand held mini-rig, which is about as small as it gets. A track rig would drive to...