Got you, that makes sense. Structural engineer has specified a 203x102UB23 with a 250x6 Plate intermittent 6FW to UB (75 weld 100 gap) sat on pad stones/blues.
Doesn't mean much to me though other than paying for the calcs and the cost of the beam and labour to fit it :eek:
With this in place...