The extension is piled and i want under floor heating on the tiled floor so there is a screed going ontop of the block and beam. The block and beam installation guide says to use weed killer on the subsoil and place a dmp with sand to hold it down before laying the beams.
I'm in the process of adding a room to the rear of the house. Currently the house floor which is suspended wood has a concrete screed about 400mm lower and is very dry down there.
My new floor is block and beam and there will about 150mm void with a dmp laid on the earth with some sand.
My...
Depends how much weight is above it and the type of drill you are using. If I have to drill near the top of an existing wall I will always go gentle and if the top brick will apply pressure to the top whilst drilling as they can come loose.
If the blocks are just wedged in what is holding the wall above them up? Does the cold room have 3 outside walls and part of the roof to outside, this may explain why it is colder than the main part of the house.