Search results

  1. S

    Tracing Wires? Tracking my ring main.

    You could check at the CU that you have some form of a ring, then get a long lead linked to one of the conductors on one leg and test at each socket to give you an idea of the order and possible cable lengths. Won't tell you about any hidden junctions and may be interesting if you have any...
  2. S

    fault current

    If you can't measure it then double the PEFC for the PSSC for three phase.
  3. S

    Glow Worm Boiler Timer

    Heating is supplied from a tank with immersion element. The boiler only supplies the central heating.
  4. S

    Glow Worm Boiler Timer

    I couldn't see a model number on it and no evidence of the manual around. I'll have another look for the model number and see if maybe there is an integral timer that can be installed in to it.
  5. S

    Glow Worm Boiler Timer

    Good evening all. Is it acceptable to install a simple timer that just switches the power on / off to the boiler that controls the central heating? I'm not sure of the model number but it doesn't have an integral or external timer or external stat fitted anywhere so heating has to be...
  6. Untitled

    Untitled

  7. Untitled

    Untitled

  8. S

    What supply type is this?

    That's fair enough but from a contractors point of view it is an extraneous conductive part. I bond old redundant supply sheaths, even if it's just an inch still popping up above floor level, particularly if in the area of the incoming supply and consumer unit, if it's extraneous, bond it.
  9. S

    What supply type is this?

    Yes, posting at the same time...!
  10. S

    What supply type is this?

    If it's an extraneous conductive part it's an extraneous conductive part...so covered by BS7671!
  11. S

    Fault in SWA cable

    Must have been a very long screw, or the neighbor is very good at gardening / ground works to hide the spot where they had dug it up to put the screw in!
  12. S

    Bending metal trunking

    I see what you're saying here and agree in principle but surely it's about doing it the 'proper way' and making it look good. My first double set in 6" galv was a proud moment!
  13. S

    Bending metal trunking

    What is the preferred method of containment / cable choice if trunking is not used?
  14. S

    Megaflo Y Plan query

    Thanks Matt. Slowly the coin drops...!
  15. S

    Megaflo Y Plan query

    Hot water OFF from programmer goes to grey of 3 port and also to terminal 3 of Megaflo thermal controls.
  16. S

    Megaflo Y Plan query

    2 port that comes with the Megaflo and a 3 port. There is a wiring diagram with the Megaflo that shows this arrangement.
  17. S

    Megaflo Y Plan query

    I'm on a job and have been asked to wire it so the 3 port was not my decision. Just wondering what the 3 terminal on the Megaflo does as obviously with 2 2 ports this is not used.
  18. S

    Megaflo Y Plan query

    What does sending 230v to terminal 3 of the Megaflo thermal control panel from DHW off actually do? If call for DHW is satisfied then 230v goes to the 3 port - understood, and the 230v is removed from the 2 port so boiler not on. Can't see what the thermal controls are doing at this stage.
  19. S

    Vailant ecoTEC 630 Wiring Question

    Hello. What is the purpose of wiring the heating / hot water controls across terminals 3 & 4 of this boiler? What additional protection / safety is gained by taking the supply to the controls from terminal 3 as opposed to supplying the controls direct from the spur supplying the boiler and then...
  20. S

    Voltage drop again

    I think using diversity with some judgment and common sense is perfectly acceptable but for ease and simplicity then using In as Ib for a ring or radial circuit with multiple socket outlets is probably the way forward...unless it means you end up having to run a huge cable! I must say that...
Back
Top