    Screed or Cement?

    Hi all I have variouse voids to fill in my hallway. one void is about 200mm down, another is where pipework runs in my conrecte block about 100mm down. Should i use a screed or a make up concrete with sand, gravel and cement? I have a bag of self levelling compound. When people advise a...
  2. C

    door threshold cavity

    yea so fill up with concrete up to outside ground level, DPM into the void 2 brick courses down lapping up the door and fill with screed to FFL.
  3. C

    door threshold cavity

    ok so all sorted. plan is to fill cavity up to the height of xternal ground level, DPM and screed to floor level. BC were happy with this method. Just thought i'd update as there are several ways to do this but thought I would share in case others have, like me mulled over this for a...
  4. C

    Thanks for responding noseall. As I have a slab foundation and not brickwork to remove how would...

    Thanks for responding noseall. As I have a slab foundation and not brickwork to remove how would be best filling the cavity without risk of damp as using a closer would be difficult as I have no lips of brick to rest this on and that slab is absolutely solid?
  5. C

    door threshold cavity

    Hi thanks for the reply. The problem is it's a slab floor so no bricks to remove and dpm where inner bricks sat on top of slab so only way to do it would be chisel the slab down but then I can't fit a closer. Sorry to trouble you. Seen nosealls reply. So would it be ok to just rest the slate on...
  6. C

    door threshold cavity

  7. C

    door threshold cavity

    Thank you very much for the reply. So at the moment because the void is about 4 brick courses deep should I refill with the soil up to almost outside ground level then create a slope with a batten, then lay dpm and fill. What's confusing me is the slope will be covered with dpm and concrete so...
  8. C

    door threshold cavity

    Thank you very much for the reply. It's an early 1980's property. The inside floor is above ground level. If I need sloping concrete how would I do this as I need to fill to floor level so flooring can go down? I'm going to insert perimeter insulation aswell.
  9. C

    door threshold cavity

    Morning all I'm currently lining my door threshold with a dpm and filling with concrete. I've dug out all the rubble but I'm now left with damp earth. I'm about 4 brick depths down. Do I start the dpm at this level or carry on removing the soil? Seems very deep and difficult to remove the...
  10. C

    missing sections of plasterboard

    Thank you. Should be alright now as bought some expanding adhesive and cut the plaster right back to the try to allow for more dot and dab
  11. C

    missing sections of plasterboard

    Morning all Please can someone advise the best way if plasterboarding missing sections around my door? I've had to cut away sections to install some insulation around the perimeter but there's now nothing to rest the plasterboard on. Do you think grip filling a baton onto the external face of...
  12. C

    Hi noseall Sorry to trouble you I have seen your posts regarding cavities below doors. Do I...

    Hi noseall Sorry to trouble you I have seen your posts regarding cavities below doors. Do I need to line the cavity with Dpm or when you say to take inner course of bricks out is this so that you would lie the Dpm over the removed bricks (in my case slab) and over the cavity to get a stronger...
  13. C

    Door threshold

    is this overkill? ie insulation etc? Shoulf i have lined the cement with DPM or does this not matter as its below door DPM? just dont want to create a load of damp and it be trapped under the DPM but is that normal anyway to have tonnes of damp below dpm so long as it's not entering the house?
  14. C

    Door threshold

    No cavity fill on this one? confused.
  15. C

    Door threshold

    Also where do i find the existing dpm? all I can see is a strip of DPM which I presume the cavity wall bricks sat on. I'm not sure if also I can get enough screed fill to stop cracking beacuse the insulation is there I will probably only get 20mm screed on top. Before filling and leaving a depth...
  16. C

    Door threshold

    Thanks for the advice. There are 2 courses of bricks outside. Cavity was really deep so would be hard to make a slope of that makes sense. My concern was that I had joined the inner and outer with mortar but I guess all front doors are like that. Would i be best laying the dpm on top of the...
  17. C

    Door threshold

    Really stuck and floor needs to be laid. Please help. I don't want damp problems.
  18. C

    Door threshold

    Also am I right in thinking there could be a dpc deep below where the ground? I couldnt see one in the void but it was filled with rubble.
  19. C

    Door threshold

    Thank you. So now I've bridged this cavity (I think that's the term) should I have left it open as I've effectively joined the inner and outer brickwork. I'm struggling getting my head round how deep the dpm needs to go and whether I should have left the cavity empty and just users a closer so...
  20. C

    Door threshold

    Hi all I would really appreciate some help. I replaced a window with a door and was left with an open cavity beefier the new door that sits on the outside wall. I have some under the sill of the door. The void/cavity was fairly deep so I filled the void and left a depth of one brick thickness...