Search results

  1. P

    Downlighters not downlighting...

    Following on from OP's original post, what causes my client's LV bathroom down lights to blow with regularity. ie within a few days of replacing the lamps. Could it be cheap transformers and if so what aspect of the transformer is at fault.
  2. P

    supply for small new build flats

    There are two small flats in this new build block. A one bedroom and a two bedroom. I will need three separate meters, one for each flat and one for the common parts. Will this require the DNO to fit three separate service heads? And can I ask the DNO to fit three isolators?
  3. P

    Please help with this window problem

    Thank you freddy...... interesting thread that. I am going to try vicks vapour rub first.
  4. P

    Please help with this window problem

    I tried that but could not afford to keep replacing the windows. Any other suggestions?
  5. P

    Please help with this window problem

    We have just built our house with new casement windows. The problem is that rooks have systematically pecked and removed the sealant between the glass and the frame. What can I do to stop this other than spend all day chasing them away?
  6. P

    2 gang switch problem

    Thanks chaps. I am going to turn it into 2 1 gang switches either side of the door. Client wants all the face plates to be the same ie not MK
  7. P

    2 gang switch problem

    I need a 2 gang switch but one of them needs to be an intermediate and one a 2 way. The range I am using does not have such a thing. Is there a way round this?
  8. P

    Max Zs entry on EIC for an RCD circuit

    So a final circuit is being protected by both an MCB and an RCD and the circuit has a measured Zs low enough to trip the MCB within 0.4s and the RCD test showed 5*I of 20ms (0.02s) then the RCD will go first, only if it is an earth fault. If there is a short circuit fault then the MCB will go as...
  9. P

    Smoke detectors

    They will be interlinked
  10. P

    Smoke detectors

    Can you use two different makes of smoke alarms on the same circuit, both being mains-powered ionisation alarms with backup battery (but different makes as I said before).
  11. P

    Maintenance free JB

    Spose so. Thanks
  12. P

    Maintenance free JB

    So if you needed to use a 4 terminal JB (for lights say) and it will just not be accessible what is the way forward?
  13. P

    Maintenance free JB

    Does anyone know where I can get them.
  14. P

    How can this be

    A TT supply, tails from meter into Henley Block supplying house CU (split with main S100mA and 30mA side) and single 30mA RCD. This single RCD supplies (via SWA) garage supply which is a normal garage CU (30mA RCD main switch with a 16A and a 6A MCB) The garage has its own earth rod and has a...
  15. P

    Plastic screws

    Thank you gentlemen
  16. P

    Plastic screws

    Does anyone know where I can get plastic M3.5 screws?
  17. P

    Alternate 2 way switching

    Someone mentioned using a relay. Does this sound workable
  18. P

    Alternate 2 way switching

    Is there a way of doing 2 way switching when there is only one twin and earth cables run to each of the 2 switch positions from a JB?
  19. P

    Some advice please - outside lights

    Total run 60 m with 4 lights at about 16m intervals. Each light is 100W
  20. P

    Some advice please - outside lights

    16 m between lights. I have run the SWA from FSU underground exiting in a long loop at each bollard and ending at the gate light. The bollard lights did not come with a PIR so I bought seperate PIRs.