I've marked the sides of the trenches, thought I was being to fussy, glad I did it now., waiting for BCO to ok the footings before driving in the pins.
Using 20mm rebar spaced at a meter apart, going to have to barrow the concrete in unfortunately, approx 4cu. Depth of concrete is 200mm...