  1. W

    Fensa

    oh just found this There are two ways to prove compliance: 1. a certificate showing that the work has been done by an installer who is registered under the FENSA Scheme 2. a certificate from the local authority saying that the installation has approval under the Building Regulations.
  2. W

    Fensa

    Had some windows and doors put into new extension, window fitter who works for builder says a fensa certificate is not needed as it is all under the building regs, is that correct? thought you had to have one?
  3. W

    sub floor

    Will 18mm far eastern hardwood ply be suitable for boarding out 1st floor on 400mm spaced joists? Don't really want any chipboard
  4. W

    Roof Tiling

    Yes there is must be 60 courses or more, and it does appear the brickwork is same height as internal block work so more an issue with the bricklayer i guess
  5. W

    Roof Tiling

    So can this still be achieved after tiling rather than bedding each verge tile as you go?
  6. W

    Roof Tiling

    I,ll have to question this then as i can't see how they can point under the undercloak without making a right old mess
  7. W

    Roof Tiling

    Is this a standard way of tiling, having tiles under battens on edge of gable?
  8. W

    Am i right and everyone else wrong?

    Guess I need to refer building inspector to this then. So I am correct in part
  9. W

    Am i right and everyone else wrong?

    Ok thanks for this, tech drawings just say a liner so not specific. I guess a flexible is really intended for old chimneys though.
  10. W

    Am i right and everyone else wrong?

    New chimney being built to take multifuel stove. I think it needs a "proper liner" i.e a Pumice liner. Builder, hetas engineer and Building control say a flexible liner is ok despite my research saying a flexible liner can't be used in a new chimney? Builder says 1st floor joists can be built...
  11. W

    Steel

    The thing is in My eyes some of the work is not OK, but I am no expert so rely on The Builder or inspector. I can't really say something is wrong as I only have limited knowledge on certain things.
  12. W

    Steel

    Well this is the point really, one body sees BC sign off as being done to a standard, but given their limited time on site it really isn't.
  13. W

    Steel

    If I spill my beer replacing it costs 4 quid, my house slightly more. If you are not going to check the plans are being followed don't insist on me having any or charging me to check they are followed. So long as Welding is OK i'm fine with it, but if not, I need the building inspector with his...
  14. W

    Steel

    So I guess i need to point this out to him as I know he will not check it. No Idea why I pay the fees the Council charge, maybe to pay for his suit and polished black shoes
  15. W

    Steel

    So is a Building inspector going to be happy? If he lets it go is that good enough?
  16. W

    Steel

    So The Building Inspector will pick up on this? I will be shocked if he does as so far not spent more than about 2 mins at any inspection and comes dressed for an opera. So I guess my Question is, Is Welding as good, worse or better than bolting.
  17. W

    Steel

    Is it acceptable to weld the steel going into a building together rather than it being bolted as per Technical drawings?
  18. W

    Build Cost

    Ok, thanks I was thinking around 35% so we are about right.
  19. W

    Build Cost

    2 storey shell only incl windows doors, , roof, tiled, Basically watertight structure no internal finishing
  20. W

    Build Cost

    What percentage of build cost should I be expected to have paid at first floor height no joists in as yet but at that stage.